Mitsubishi Galant

1990 — 2001 of release

Repair and car operation



Mitsubishi Galant
+ Identification numbers of the car
+ Governing bodies
+ Settings and routine maintenance
+ Engine
+ cooling and heating Systems
- Power supply system and release
   Specifications
   Sbrasyvaniye of pressure in a power supply system
   Removal and installation of the case of a throttle
   Removal and installation of the fuel highway and injection injectors
   Check of a condition and replacement of fuel lines and their shtutserny connections
   Check of serviceability of functioning of injectors
   Removal and installation of a regulator of pressure of fuel
   Removal and installation of a safety valve of a fuel tank
   Removal and installation of a fuel tank
   Cleaning and repair of a fuel tank - general information
   Check of serviceability of functioning of the fuel pump, measurement of pressure of fuel
   Removal and installation of the fuel pump/sensor of fuel consumption
   Removal and installation of assembly of an air purifier
   Release system
+ engine Electric equipment
+ Control systems of the engine
+ Manual transmission
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation of the case of a throttle

Details of installation of the case of a throttle on models of 1.5 l

1 — a gas Cable
2 — I Will corrode TPS electroconductings
3 — I Will corrode electroconductings of the servo-driver of management by idling turns
4 — Vacuum hoses

5 — Hoses of a water path
6 — the throttle Case
7 — Sealing laying


Details of installation of the case of a throttle on models of 1.8 l

1 — a gas Cable
2 — I Will corrode TPS electroconductings
3 — I Will corrode electroconductings of the servo-driver of management by idling turns
4 — Vacuum hoses

5 — the Vacuum hose (models with tempostaty)
6 — Hoses of a water path
7 — the throttle Case
8 — Sealing laying


Details of installation of the case of a throttle on models of 1.6 l and 2.0 l of DOHC

1 — a gas Cable
2 — the Ventilating hose
3 — the Inlet air line
4 — the Air sleeve With
5 — the Vacuum hose
6 — Sockets of electroconducting of the driving IAC motor and the sensor switch of a closed position of a butterfly valve
7 — I Will corrode TPS electroconductings
8 — the Transit hose of a water path

9 — Perepuskna a hose of a water path
10 — the Screw of fastening of a plate of grounding
11 — the Basic arm of the case of a throttle and a grounding plate
12 — the Branch pipe of connection of an air line
13 — Sealing laying
14 — the throttle Case
15 — Sealing laying


Details of installation of the case of a throttle on models of 3.0 l of SOHC and DOHC

1 — a gas Cable
2 — I Will corrode TPS electroconductings
3 — I Will corrode electroconductings of the servo-driver of management by idling turns (I — AC)
4 — Vacuum hoses

5 — the Hose of a water path
6 — the Vacuum tube
7 — the throttle Case
8 — Sealing laying


Details of installation of the case of a throttle on models of 3.5 l

1 — a gas Cable
2 — the Inlet air line
3 — Hoses of a heating path
4 — the Vacuum hose
5 — I Will corrode TPS electroconductings

6 — I Will corrode electroconductings of the servo-driver of management by idling turns
7 — the throttle Case
8 — Sealing laying


Removal

 PERFORMANCE ORDER

1. Details of installation of the case of a throttle on various engines are presented on illustrations.
2. Dump pressure in a power supply system (see. Undressed Sbrasyvaniye pressure in a power supply system).
3. Empty cooling system.

4. Mark the provision of an adjusting bolt on a fixing flange of a cable of a drive of a butterfly valve (gas). Turn out a bolt and disconnect a cable from the lever of a drive of a butterfly valve on the throttle case. Take a cable aside.

5. Disconnect from the case of a throttle and take aside a ventilating hose and a hose of supply of air.
6. Mark and disconnect vacuum hoses.

7. Mark and disconnect brought to the throttle case electroconducting.

8. Disconnect from the basis of the case of a throttle transit and perepuskny hoses of a water path.
9. At the corresponding complete set disconnect the tire of grounding and remove from the engine a basic arm of the case of a throttle and a grounding plate.
10. Remove a branch pipe of connection of an air line its sealing laying.

11. Turn out fixing screws and remove the throttle case from the engine. Remove sealing laying, - at installation it is subject to replacement without fail.


Installation

 PERFORMANCE ORDER

1. Carefully smooth out all interfaced surfaces, lay on the delivery chamber of the inlet pipeline new sealing laying.
2. Establish the throttle case. Screw and tighten with demanded effort fixing bolts.
3. Having replaced sealing laying, establish a branch pipe of connection of an inlet air line.
4. At the corresponding complete set establish a basic arm and a grounding plate. Screw fixing bolts and tighten them with demanded effort (15 ÷ 22 H • м).
5. Screw the screw of fastening of a plate of grounding.
6. Connect to the throttle case hoses of a water path and fix them new collars.
7. Watching compliance the marking put in the course of dismantle, restore initial connection of vacuum hoses and electroconducting.
8. Connect a gas cable, having screwed in former situation an adjusting bolt. Check correctness of adjustment of a cable.
9. Connect an inlet air line and a ventilating hose.
10. If removed, establish into place the battery and connect to it wires (at first positive, then - negative).
11. Fill in in the engine fresh cooling liquid (see. Head of Control and routine maintenance).