Mitsubishi Galant

1990 — 2001 of release

Repair and car operation



Mitsubishi Galant
+ Identification numbers of the car
+ Governing bodies
+ Settings and routine maintenance
+ Engine
+ cooling and heating Systems
+ Power supply system and release
+ engine Electric equipment
+ Control systems of the engine
- Manual transmission
   + 5-step manual box of gear shifting (RKPP)
   + Automatic transmissions (AT)
   - Transfer case
      General information
      Replacement of a back epiploon of a transfer case
      Removal and installation of the lever of a transfer case
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


Removal and installation of the lever of a transfer case

Removal

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped with a security code before disconnecting the battery make sure that have the correct combination for audiosystem input in action!

2. To Poddomkratta the car also establish it on props. Merge from a transfer case oil.
3. Disconnect from a final collector a reception pipe of system of production of the fulfilled gases.
4. To Otboltita a transfer case and accurately remove it from the back driveshaft, - try not to damage planted in a casing of a target compartment an epiploon. At once tie up the free end of the driveshaft a wire to frame elements.
5. To Zakuporta of an opening in a box and a transmission case for the purpose of minimization of losses of transmission oil and in order to avoid hit in dirt components.


Installation

 PERFORMANCE ORDER

1. Grease a sliding collar of the driveshaft and an epiploon sponge in a casing of lengthening of a transfer case. Establish a box on transmission. In the course of connection to a box of the driveshaft try not to damage an epiploon.
2. Tighten bolts of fastening of a transfer case with demanded effort (55 ÷ 60 H • м: for models with RKPP and 60 ÷ 80 H • м: for models with AT).
3. Having replaced sealing laying, connect a reception pipe to a final collector.
4. Establish into place all components acting in film for the purpose of ensuring access.
5. Fill in fresh transmission oil in a transfer case and transmission (see. Head of Control and routine maintenance).